Upfits

Diamond Contracting can help you with that internal remodel to keep up with your growing business. Whether you need to update your facility or need to expand for more space, Diamond Contracting will get the project done quickly, with superior craftsmanship. Our commitment to priceless quality and customer service has helped us build strong relationships with our clients through up fits and renovations. Whether a large scale or small scale up fit, we give the project the attention it needs and can respond to the urgency of your business practices.

ABC STORE #4 Mission Valley Shopping Center

Work is completed on the interior alteration of approximately 4,000 sq ft retail space in the Mission Valley Shopping Center for the new ABC store.

abc#4 2 abc#4 1 abc#4 1 abc#4 2 abc#4 3 abc#4 4 abc#4 5 abc#4 6


ABC STORE #8 Cameron Village Shopping Center

Work was completed for interior alteration of approximately 6,400 sq ft retail space in the Cameron Village Shopping Center for the new ABC store to open in October 2015.

abc#8 1 abc#8 2 abc#8 3 abc#8 4 abc#8 1 abc#8 2 abc#8 3 ABC#8 4 ABC#8 5 ABC#8 6


Up Fit for Hand & Stone Massage & Facial Spa Facility

Diamond Contracting is providing the up fit of a 2,310 sq ft vacant space in Meadowmist Village in Chapel Hill, the up fit of a 2,564 ft vacant space in Bradford Shopping Center in Cary and the up fit of  a 3,234 sq ft vacant space in Cresent Commons in Cameron Village. These projects were complete turn key construction projects for Hand & Stone, a therapeutic massage and facial services facilty. For more information you may refer to their website at www.handandstone.com.

HSCHILL2 HSCHILL3 HSCHILL4 hscary7


Shining Stars Pediatric Therapy facility

Diamond Contracting has been awarded the contract for the upfit of 2,800 sq ft of space in Fuquay-Varina for the relocation of Shining Stars Pediatric Therapy.  The project consists of complete new space in an existing shell building.  The work includes offices, therapy rooms, common areas, and bath and break rooms.  This project is scheduled for completion at the end of August 2014.  Shining Stars Pediatric Therapy offers pediatric occupational, physical, speech, and developmental therapy services.  For more information you may visit their website at www.shiningstarstherapy.com.

sspt 1 sspt 2 sspt 3 sspt 4 sspt 5 sspt 6 sspt 7 sspt 8


Technical Distribution Center – RTP area

Diamond Contracting is managing the alteration of office, lab and warehouse space for a tech distribution center of over 52,000 sq ft in the RTP area. The distribution center will house new, certified reuse communications equipment, offer manufacturing services, asset remarketing, and professional technical and maintenance services, including repair and exchange and spare parts management. The project is scheduled for completion in 60 days.

phoenix 15 phoenix 14 phoenix 8 phoenix 1


European Wax Center

ewc park 1 Interior hallway North Ridge European Wax Center Interior-EWC  ewc park 8 EWC PW 7 EWC PW 6

Completed the renovation and up fits of multiple European Wax Centers located throughout Wake County. Renovations included interior demolition and reconstruction and exterior storefronts for 1,200 to 1,600 sq ft existing retail spaces. (Northridge, Beaver Creek, Tryon Village, Brier Creek, Southpoint, Park West, Cameron Village).


Max MuscleFit Up Max MuscleMax Muscle

Red Tail Fitness required a fit-up of an existing 1,200 sq ft retail space to open a Max Muscle Sports Nutrition retail store. Diamond Contracting performed demolition of existing interior, installed new track lights and pendant lights, upgraded electrical, HVAC, and plumbing facilities, and added new wing walls, new ceiling tile and new flooring.



demolition of interior office space
Clark Nexsen office expansionClark Nexsen Architecture Office Expansion

Construction, up fit and modifications to an existing 4,350 sq ft expansion space on the second floor of the Clark Nexsen Architecture office building included new framing, sheetrock, paint, butt glaze glass, floor tile, carpet, cabinetry, sprinkler system, HVAC and upgraded electrical units.


NC Wildlife Resourses Commisionrenovation of Falls Lake DepotFalls Lake Depot

The Falls Lake Depot project in Creedmoor, NC for the NC Wildlife Resources Commission involved the renovation and up-fit of the 2700 sq ft existing building to office space.


Lincoln Dealership

Lincoln Dealership Lincoln Showroom 1 Lincoln Showroom 2 Lincoln Showroom 3

The Lincoln Service Center and Showroom was a renovation, addition, and fit up of a previous Honda dealership into a new 10,000 sq ft facility entailing selective demolition and addition of new structure to the front of the building.


Soldiers Memorial Arena

Soldiers Memorial Arena

This 23,150 sq ft project for the Town of Butner required the renovation of the existing gymnasium and associated interior and exterior improvements including refinishing the gym floor, new toilet facilities, new electrical, mechanical, fire alarm, and fire suppressions systems.

“This project was complex in nature, and there were many obstacles during the construction process, which is often the case with old buildings.  We have worked closely with Bryan Wolfe and Scott Gossage, and it has been a great experience. We found them to be extremely professional and accessible.  They addressed questions thoroughly in a timely manner, and proposed solutions for any problems that arose. The project is on schedule and the overall quality of construction is excellent. The Town of Butner received great value for the price of the project. Thank you for all that you have done to make this job a pleasant experience. We are completely satisfied with the end result and congratulate you on a job well done.”

Michael Kilian, PE                               Kilian Engineeering, Inc.